Sizewell A site
Sizewell A is located on a 13 hectare site adjacent to Sizewell B power station, near Leiston in Suffolk.
A landmark decommissioning project to de-plant and demolish the turbine hall and adjoining electrical annexe and fire station completed in 2025. Watch the story here The Sizewell A turbine hall story from construction to demolition
More than 15,000 tonnes of crushed concrete from the demolished turbine alternator plinths were transferred to the main construction area at Sizewell C. Read the full story at Sizewell A concrete reused at Sizewell C – GOV.UK
The site is now focussed on reducing hazards, progressing ponds decommissioning and retrieving historical wastes.
Intermediate level radioactive waste from Sizewell A is transferred to the long term storage facility at Bradwell site.
Bradwell site’s care and maintenance phase is being managed by Sizewell A. The team conduct annual maintenance inspections at Bradwell and maintain a 24-hour security presence on site.

In pictures















Key facts
1960
Construction began
1966
Generation started
2006
Generation ended
2006
Defueling started
2015
Defueling completed
110
Terawatt hours generated
2
Number of reactors
1.2 hectares
National Grid yard land released for re-use