HS2 Independent Design Panel: Case Studies
A series of case studies about the work of the HS2 Independent Design Panel.
Updates to this page
- From:
- High Speed Two (HS2) Limited
- Published:
- 24 October 2016
- Last updated:
-
13 February 2024
Show all updates
-
Edgcote Viaduct case study added.
-
Mcr Ship Canal case study added
-
Added case studies for Curzon Street Station and Phase 2a - learning lessons.
-
Depots case study added
-
Urban integration case study added
-
Arts and mobilisation case studies added
-
addition of Case Study No.5 about rail operations and the Proxy Operator Strategy
-
Mentoring case study added
-
First published.
-
Documents
HS2 design case study: Edgcote Viaduct (November 2023)
PDF, 1.64 MB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Innovation (May 2020)
PDF, 111 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Phase 2a (January 2020)
PDF, 729 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Manchester Ship Canal Viaduct (February 2020)
PDF, 733 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Curzon Street Station (January 2020)
PDF, 563 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Leeds Station (April 2019)
PDF, 1.16 MB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Customer Experience (January 2019)
PDF, 3.39 MB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Interchange Station (October 2018)
PDF, 350 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Depots (August 2018)
PDF, 428 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Urban Integration (July 2018)
PDF, 818 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Mobilisation Programme Hot Starts (October 2017)
PDF, 139 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Arts and Strategy (October 2017)
PDF, 333 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Railway Operations (August 2017)
PDF, 242 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Mentoring (February 2017)
PDF, 115 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Landscape Design Approach (October 2016)
PDF, 246 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: South Yorkshire (August 2016)
PDF, 287 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
HS2 design case study: Bridge Design Requirements (June 2016)
PDF, 132 KB, 2 pages
This file may not be suitable for users of assistive technology.
Request an accessible format
Details
The High speed Two (HS2) Independent Design Panel was set up in 2015 to help HS2 Ltd realise its aim of applying the best design principles to all its work. The panel has around 40 experts with a wealth of specialist experience providing independent advice to HS2 Ltd.