Price control deliverables (PCDs) set out our expectations for delivery specifically on improvements (or ‘enhancements’), funded through enhancement expenditure allowances. Where water companies fail to deliver these outcomes or outputs, they will return funding to customers.
PCDs are another regulatory tool we use to encourage companies to deliver the funded improvements on a timely manner and to protect customers from companies failing to deliver these improvements or deliver them late.
Previously, we used a form of PCD at the 2019 price review to protect material enhancement investments in areas where there is no regulatory oversight from other regulators (i.e. resilience). In PR19, we referred to these incentives as scheme-specific performance commitments. PCDs are also used in other sectors. For example, Ofgem uses PCDs to adjust allowances downwards in response to scale of non-delivery for commercial Electric Vehicle Fleets, Gas Holder demolitions and cyber resilience.
PCDs will:
- increase our oversight of delivery through increased reporting and the assurance requirements on what companies are delivering;
- protect customers from companies failing to deliver the funded improvements by returning the funding to customers; and
- encourage companies to deliver on time by applying time-based incentives.
We set out our overall approach to PCDs in section 4.7.2 of PR24 final determinations: Expenditure allowances.
We set out our detailed PCD proposals in PR24 final determinations: Price control deliverables appendix (republished 27 November 2025). This sets out the common requirements for price control deliverables in each area. Our assessment of the impact of time incentive PCDs on RoRE ranges is set out in PCD RoRE impact model.
We are publishing a draft PCD Reconciliation model (republished 13 February 2025) alongside our final determinations. We welcome views from stakeholders on this model by 14 February 2025. We will then publish a final PCD reconciliation model by late spring 2025.
Company specific PCD requirements are set out in the excel files below:
- Base PCDs (republished 15 May 2025)
- Water WINEP PCDs
- Water Supply and Demand Balance PCDs (republished 13 August 2025)
- Water Quality PCDs (republished 19 August 2025)
- Water Resilience and Security PCDs (republished 3 April 2025)
- Wastewater Flow and Monitoring PCDs (republished 4 April 2025)
- Wastewater treatment PCDs
- Wastewater Other WINEP PCDs (republished 17 July 2025)
- Wastewater Scheme level PCDs (republished 13 June 2025)
- Wastewater Bioresources PCDs
- Wastewater Other Storm Overflow PCDs
- Wastewater Other PCDs
- WINEP and GER Carryover PCDs
- Net Zero PCDs (republished 4 July 2025)
- PR19 ODI PCDs (republished on 13 November with ODI final determinations)